ITAC Assessment: WI0306
ITAC logo
ITAC Assessment: WI0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Trailer and marine accessories
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 110,000
ft2
Annual Production 7,150,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,846 1,073,857
kWh
Electricity Demand $32,308 3,691
kW-mo/yr
Electricity Fees $850 -
Natural Gas $35,795 7,682
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.445: Install equipment to move product $71,719 $240,000 - - - $71,719 -
02 2.8113: Purchase gas directly from a contract gas supplier $6,278 $500 - - - - $6,278
03 2.3191: Use demand controller or load shedder $1,236 $5,000 - $1,236
-
kW-mo/yr
- - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $420 - - - $420
-
lb
- -
05 2.4221: Install compressor air intakes in coolest locations $390 $1,280 $156
5,275
kWh
$234
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $80,043 $246,780 $156
5,275
kWh
$1,470
-
kW-mo/yr
$420
-
lb
$71,719 $6,278
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs