| Assessment Year | 2006 |
|---|---|
| Principal Product | ferrous, nonferrous and high temperature alloy products |
| NAICS | 332111: Iron and Steel Forging |
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $10 M to 50M |
| # of Employees | 82 |
| Plant Area |
438,865
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,208
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $611,840 | 26,123 |
kWh
|
$23.42 |
| Electricity Demand | $188,658 | 38,293 |
kW-mo/yr
|
$4.93 |
| Natural Gas | $107,477 | 43,482 |
MMBtu
|
$2.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $115,839 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $115,155 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $66,794 | $14,400 |
$66,794
1,232,358
kWh
|
- | - | |
| 02 | 2.7231: Use radiant heater for spot heating | $21,785 | $14,190 | - | - |
$21,785
-
MMBtu
|
|
| 03 | 2.2511: Insulate bare equipment | $24,225 | $1,020 | - | - |
$24,225
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,234 | $60 |
$1,841
33,973
kWh
|
$393
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $684 | - |
$547
10,300
kWh
|
$137
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $117 | $270 |
$104
1,962
kWh
|
$13
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $115,839 | $29,940 |
$69,286
1,278,593
kWh
|
$543
-
kW-mo/yr
|
$46,010
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $115,155 | $29,940 |
$68,739
1,268,293
kWh
|
$406
-
kW-mo/yr
|
$46,010
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs