ITAC Assessment: UU0092
ITAC logo
ITAC Assessment: UU0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Books
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 500,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,450
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $593,890 12,175,721
kWh
Natural Gas $211,839 34,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.8137: Use soy or water-based inks $28,070 $20,000 - - $28,070
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $5,250 $19,000 - - $5,250
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,083 $3,270 $1,010
43,060
kWh
$2,073
-
kW-mo/yr
-
04 2.7134: Use photocell controls $1,130 $1,800 $230
9,950
kWh
$900
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $740 $280 $460
19,560
kWh
$280
-
kW-mo/yr
-
TOTAL RECOMMENDED $38,273 $44,350 $1,700
72,570
kWh
$3,253
-
kW-mo/yr
$33,320
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs