ITAC Assessment: WI0512
ITAC logo
ITAC Assessment: WI0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product die cast parts
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,943 7,868,400
kWh
Electricity Demand $148,848 16,789
kW-mo/yr
Natural Gas $914,302 115,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 4.513: Re-arrange equipment layout to reduce labor costs $554 $21,500 - - - $554
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,679 $72,610 $19,672
534,570
kWh
$10,007
-
kW-mo/yr
- -
03 3.3131: Use evaporation to concentrate material $24,691 $12,000 - - $24,691
-
gal
-
04 4.447: Automate payroll system $5,350 - - - - $5,350
05 2.4221: Install compressor air intakes in coolest locations $3,371 $3,200 $1,728
46,956
kWh
$1,643
-
kW-mo/yr
- -
06 2.3132: Recharge batteries on during off-peak demand periods $843 $700 - $843
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $258 $150 $258
7,020
kWh
- - -
TOTAL RECOMMENDED $64,746 $110,160 $21,658
588,546
kWh
$12,493
-
kW-mo/yr
$24,691
-
gal
$5,904
TOTAL IMPLEMENTED $36,130 $73,460 $19,930
541,590
kWh
$10,850
-
kW-mo/yr
- $5,350
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs