ITAC Assessment: UC2201
ITAC logo
ITAC Assessment: UC2201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Precision aerospace and medical components
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 80,000
ft2
Annual Production 5,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,495 2,540,170
kWh
Electricity Demand $153,009 7,476
kW-mo/yr
Electricity Fees $45,184 -
Natural Gas $37,551 2,490
MMBtu
TOTAL YEARLY COSTS $497,239
RECOMMENDED SAVINGS* $211,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $13,041 $56,085 $4,376
42,527
kWh
$1,193
-
kW-mo/yr
- - $7,472
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,440 $15,982 $2,391
23,239
kWh
$1,048
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $20,036 $48,285 $12,816
124,552
kWh
$7,369
-
kW-mo/yr
- $613 $(-763.0)
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,728 $2,000 $4,909
47,711
kWh
$819
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $2,009 $4,000 $1,723
16,741
kWh
$287
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,185 $200 $1,017
9,884
kWh
$168
-
kW-mo/yr
- - -
07 2.9114: Use solar heat to make electricty $158,531 $626,592 $109,089
1,060,143
kWh
$68,042
-
kW-mo/yr
- - $(-18,600.0)
08 2.8123: Pay utility bills on time $530 - - - $530 - -
09 2.8114: Change rate schedules or other changes in utility service $6,563 - - - $6,563 - -
TOTAL RECOMMENDED $211,063 $753,144 $136,322
1,324,797
kWh
$78,927
-
kW-mo/yr
$7,093 $613 $(-11,891.0)
TOTAL IMPLEMENTED $45,898 $106,370 $22,102
214,790
kWh
$9,381
-
kW-mo/yr
$7,093 $613 $6,709
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings