ITAC Assessment: UA0154
ITAC logo
ITAC Assessment: UA0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product rolled steel cut to size
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 18
Plant Area 110,000
ft2
Annual Production 80,000
ton
Production Hrs. Annual 2,168
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,372 870,600
kWh
Electricity Fees $23,006 -
LPG $47,452 4,212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings LPG Savings
01 4.454: Modify startup/shutdown times $3,959 - - $3,959 -
02 2.7313: Recycle air for heating, ventilation and air conditioning $1,116 $1,660 - - $1,116
-
MMBtu
03 2.7491: Insulate glazing, walls, ceilings, and roofs $201 $508 - - $201
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $566 $2,045 $537
6,740
kWh
$29 -
05 2.7134: Use photocell controls $414 $664 $393
4,931
kWh
$21 -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $175 $120 $166
2,086
kWh
$9 -
TOTAL RECOMMENDED $6,431 $4,997 $1,096
13,757
kWh
$4,018 $1,317
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs