ITAC Assessment: IA0296
ITAC logo
ITAC Assessment: IA0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product modified and unmodified corn starch
NAICS
n/a
SIC 2046: Wet Corn Milling
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 1,132,560
ft2
Annual Production 800,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,308,812 116,956,800
kWh
Electricity Demand $1,393,023 15,981
kW-mo/yr
Natural Gas $3,417,183 644,591
MMBtu
Other Energy $5,517,789 1,047,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,888 $436 $1,542
54,308
kWh
$346
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $4,082 $586 $3,397
119,613
kWh
$685
-
kW-mo/yr
-
03 2.2135: Repair and eliminate steam leaks $5,317 $1,800 - - $5,317
-
MMBtu
04 2.2113: Repair or replace steam traps $5,180 $1,320 - - $5,180
-
MMBtu
05 2.7135: Install occupancy sensors $341 $466 $341
12,013
kWh
- -
06 2.2511: Insulate bare equipment $83,966 $138,450 - - $83,966
-
MMBtu
07 2.4133: Use most efficient type of electric motors $12,371 - $10,108
355,919
kWh
$2,263
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,948 $6,025 $2,408
84,797
kWh
$540
-
kW-mo/yr
-
TOTAL RECOMMENDED $116,093 $149,083 $17,796
626,650
kWh
$3,834
-
kW-mo/yr
$94,463
-
MMBtu
TOTAL IMPLEMENTED $12,385 $3,556 $1,542
54,308
kWh
$346
-
kW-mo/yr
$10,497
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs