ITAC Assessment: UM0298
ITAC logo
ITAC Assessment: UM0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Precision Springs
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range n/a
# of Employees 32
Plant Area 22,000
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,287 161,273
kWh
Electricity Demand $9,739 766
kW-mo/yr
Electricity Fees $286 -
Natural Gas $2,229 220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,759 $1,050 $994
13,044
kWh
$765
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,355 $1,863 $813
10,665
kWh
$542
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $799 $1,040 - - $799
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $243 $200 $137
1,803
kWh
$106
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $126 $92 $126
1,656
kWh
- -
TOTAL RECOMMENDED $4,282 $4,245 $2,070
27,168
kWh
$1,413
-
kW-mo/yr
$799
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs