ITAC Assessment: CO0154
ITAC logo
ITAC Assessment: CO0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SMALL PLATED PARTS
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,113 655,041
kWh
Natural Gas $17,289 4,321
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,311

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $1,153 $250 $866
-
kWh
$287
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,360 $3,500 $3,360
43,962
kWh
$(-1,000.0)
-
MMBtu
03 2.7261: Install timers and/or thermostats $530 $79 $140
5,275
kWh
$390
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,020 $1,000 - $1,020
-
MMBtu
05 2.1222: Install turbulators $277 $800 - $277
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $500 $680 $500
6,448
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $618 $131 $618
8,206
kWh
-
08 2.2511: Insulate bare equipment $130 $310 - $130
-
MMBtu
TOTAL RECOMMENDED $6,588 $6,750 $5,484
63,891
kWh
$1,104
-
MMBtu
TOTAL IMPLEMENTED $6,311 $5,950 $5,484
63,891
kWh
$827
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs