ITAC Assessment: OK0904
ITAC logo
ITAC Assessment: OK0904
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product circuit board assemblies
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 65,000
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 2,875
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,297 2,022,224
kWh
Electricity Demand $43,345 5,595
kW-mo/yr
Natural Gas $15,456 1,978
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,303 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $4,880 $14,220 - - $4,880
02 2.8121: Apply for tax-free status for energy purchases $5,563 $180 - - $5,563
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,580 $12,793 $1,046
18,678
kWh
$535
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $566 $3,240 $566
10,102
kWh
- -
05 2.7135: Install occupancy sensors $1,292 $2,535 $1,292
23,079
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,742 $950 $1,742
31,113
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,742 $950 $1,742
31,113
kWh
- -
08 2.4226: Use / purchase optimum sized compressor $2,777 $6,922 $3,645
65,088
kWh
$(-867.6)
-
kW-mo/yr
-
09 2.6218: Turn off equipment when not in use $6,591 $200 $6,591
117,700
kWh
- -
10 2.4322: Use or replace with energy efficient substitutes $9,428 $35,000 $593
10,583
kWh
$8,835
-
kW-mo/yr
-
11 2.6231: Utilize controls to operate equipment only when needed $2,141 $1,500 $2,141
38,230
kWh
- -
TOTAL RECOMMENDED $38,303 $78,490 $19,358
345,686
kWh
$8,502
-
kW-mo/yr
$10,443
TOTAL IMPLEMENTED $17,360 $20,335 $6,917
123,535
kWh
- $10,443
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs