Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Iron foundries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0099 #06 Y:2026 Use or replace with energy efficient substitutes $317 $1,060
MU0099 #05 Y:2026 Use or replace with energy efficient substitutes $136 $234
MU0099 #04 Y:2026 Use or replace with energy efficient substitutes $1,313 -
MU0099 #03 Y:2026 Recover heat from exhausted steam, hot air or hot water $2,807 $7,385
MU0099 #02 Y:2026 Use or replace with energy efficient substitutes $26,121 $4,117
MU0099 #01 Y:2026 Lease / purchase baler; sell cardboard to recycler $35,201 $9,454
UW2514 #04 Y:2025 Use / purchase optimum sized compressor $7,983 $32,480
UW2514 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,640 $7,378
UW2514 #02 Y:2025 Upgrade obsolete equipment $47,564 $93,719
UW2514 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,393 $4,741
OK1142 #06 Y:2025 Reduce space conditioning during non-working hours $401 -
OK1142 #05 Y:2025 Install occupancy sensors $6,818 $1,869
OK1142 #04 Y:2025 Eliminate or reduce compressed air usage $1,322 -
OK1142 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,157 $2,317
OK1142 #02 Y:2025 Recover waste heat from equipment $1,244 $80
OK1142 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,888 $1,688
UC2504 #07 Y:2025 Use solar heat to make electricty $223,326 $1,974,272
UC2504 #06 Y:2025 Keep doors and windows shut when not on use $8,677 -
UC2504 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,212 $2,686
UC2504 #04 Y:2025 Install timers and/or thermostats $21,015 $1,166