ITAC Assessment: MU0058
ITAC logo
ITAC Assessment: MU0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product iron products
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 75,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,427 611,480
kWh
Electricity Fees $2,667 -
Natural Gas $14,910 1,907
MMBtu
Other Gas $1,302 1
MMBtu
TOTAL YEARLY COSTS $136,305
RECOMMENDED SAVINGS* $53,792 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $135 $370 - - $135
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $40,066 $1 $40,066
210,873
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $239 $34 $239
1,261
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $253 - $253
1,331
kWh
- -
05 2.7135: Install occupancy sensors $99 $118 $99
520
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,944 $1,620 $4,944
26,018
kWh
- -
07 2.7261: Install timers and/or thermostats $2,805 $870 - - $2,805
-
MMBtu
08 2.7444: Close holes and openings in building such as broken windows $4,637 $623 - - $4,637
-
MMBtu
09 4.821: Pay bills on time to avoid late fees $613 - - $613 -
TOTAL RECOMMENDED $53,792 $3,636 $45,601
240,003
kWh
$613 $7,577
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs