ITAC Assessment: SF0632
ITAC logo
ITAC Assessment: SF0632
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Precision Airflow Measurement Devices
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 40,900
ft2
Annual Production 7,500
units
Production Hrs. Annual 3,155
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,090 200,206
kWh
Electricity Demand $17,743 868
kW-mo/yr
Natural Gas $11,585 546
MMBtu
TOTAL YEARLY COSTS $88,418
RECOMMENDED SAVINGS* $19,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,457 - $3,457
15,997
kWh
- - -
02 2.6218: Turn off equipment when not in use $723 - $723
2,450
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $173 $158 $136
462
kWh
$37
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,394 $12,341 $11,623
39,385
kWh
$3,485
-
kW-mo/yr
$356 $(-70.0)
TOTAL RECOMMENDED $19,747 $12,499 $15,939
58,294
kWh
$3,522
-
kW-mo/yr
$356 $(-70.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs