Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Iron Casting
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 200,000
ft2
Annual Production 20,000
ton
Production Hrs. Annual 4,500
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,778,152 18,251,014
kWh
Electricity Demand $1,361 287
kW-mo/yr
Electricity Fees $73,229 -
Natural Gas $60,894 14,656
MMBtu
TOTAL YEARLY COSTS $1,913,636
RECOMMENDED SAVINGS* $113,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $36,113 $1,750 $36,113
370,772
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $62,000 $8,591 $62,000
636,540
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,442 $4,771 $8,442
86,672
kWh
-
04 2.7135: Install occupancy sensors $454 $2,418 $454
4,662
kWh
-
05 2.7231: Use radiant heater for spot heating $6,661 $23,010 - $6,661
-
MMBtu
TOTAL RECOMMENDED $113,670 $40,540 $107,009
1,098,646
kWh
$6,661
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs