Assessment Year | 2025 |
---|---|
Principal Product | Iron Casting |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
200,000
ft2
|
Annual Production | 20,000
ton
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,778,152 | 18,251,014 |
kWh
|
$0.097 |
Electricity Demand | $1,361 | 287 |
kW-mo/yr
|
$4.74 |
Electricity Fees | $73,229 | - |
|
- |
Natural Gas | $60,894 | 14,656 |
MMBtu
|
$4.15 |
TOTAL YEARLY COSTS | $1,913,636 | |||
RECOMMENDED SAVINGS* | $113,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $36,113 | $1,750 |
$36,113
370,772
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $62,000 | $8,591 |
$62,000
636,540
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,442 | $4,771 |
$8,442
86,672
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $454 | $2,418 |
$454
4,662
kWh
|
- | |
05 | 2.7231: Use radiant heater for spot heating | $6,661 | $23,010 | - |
$6,661
-
MMBtu
|
|
TOTAL RECOMMENDED | $113,670 | $40,540 |
$107,009
1,098,646
kWh
|
$6,661
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs