ITAC Assessment: OK1142
ITAC logo
ITAC Assessment: OK1142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Ductile and grey iron castings
NAICS 331511: Iron Foundries
SIC 3322: Malleable Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 44,500
ft2
Annual Production 3,257,438
units
Production Hrs. Annual 2,255
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,958 3,723,950
kWh
Electricity Demand $407,894 16,904
kW-mo/yr
Electricity Fees $39,130 -
Natural Gas $22,854 6,822
MMBtu
Waste Disposal Costs
Water Usage $4,680 1,013
Tgal
Water Disposal $5,632 1,013
Tgal
TOTAL YEARLY COSTS $629,148
RECOMMENDED SAVINGS* $17,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,888 $1,688 $4,888
122,202
kWh
-
02 2.2437: Recover waste heat from equipment $1,244 $80 - $1,244
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,157 $2,317 $3,157
78,914
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $1,322 - $1,322
33,036
kWh
-
05 2.7135: Install occupancy sensors $6,818 $1,869 $6,818
170,439
kWh
-
06 2.7224: Reduce space conditioning during non-working hours $401 - $401
10,032
kWh
-
TOTAL RECOMMENDED $17,830 $5,954 $16,586
414,623
kWh
$1,244
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs