Assessment Year | 2025 |
---|---|
Principal Product | Metal Casting |
NAICS | 331511: Iron Foundries |
SIC | 3322: Malleable Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
80,000
ft2
|
Annual Production | 580,000
pieces
|
Production Hrs. Annual | 6,375
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,323,744 | 12,345,481 |
kWh
|
$0.11 |
Electricity Demand | $744,792 | 66,028 |
kW-mo/yr
|
$11.28 |
Electricity Fees | $(-333,049.5) | - |
|
- |
LPG | $402,323 | 28,521 |
MMBtu
|
$14.11 |
TOTAL YEARLY COSTS | $2,137,810 | |||
RECOMMENDED SAVINGS* | $313,772 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $19,657 | $60 |
$19,657
183,370
kWh
|
- | - | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $33,264 | $60 |
$33,264
310,302
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,622 | $1,600 |
$4,039
37,680
kWh
|
$582
-
kW-mo/yr
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $21,015 | $1,166 |
$2,953
27,547
kWh
|
- |
$18,062
-
MMBtu
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,212 | $2,686 |
$2,807
26,185
kWh
|
$405
-
kW-mo/yr
|
- | - | |
06 | 2.7442: Keep doors and windows shut when not on use | $8,677 | - | - | - |
$8,677
-
MMBtu
|
- | |
07 | 2.9114: Use solar heat to make electricty | $223,326 | $1,974,272 |
$254,961
2,378,366
kWh
|
- | - | $(-31,635.3) | |
TOTAL RECOMMENDED | $313,772 | $1,979,844 |
$317,682
2,963,450
kWh
|
$987
-
kW-mo/yr
|
$26,739
-
MMBtu
|
$(-31,635.3) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs