1,117
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UW2514 #04 Y:2025 | 04 | 2025 | Use / purchase optimum sized compressor | $7,983 | $32,480 |
n/a
|
| UW2514 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $1,640 | $7,378 |
n/a
|
| UW2514 #02 Y:2025 | 02 | 2025 | Replace boiler | $55,958 | $93,719 |
n/a
|
| UW2514 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,393 | $4,741 |
n/a
|
| UU0282 #10 Y:2025 | 10 | 2025 | Utilize higher efficiency lamps and/or ballasts | $3,520 | $9,240 |
n/a
|
| UU0282 #09 Y:2025 | 09 | 2025 | Air condition only space necessary | $1,130 | $2,230 |
n/a
|
| UU0282 #08 Y:2025 | 08 | 2025 | Insulate bare equipment | $3,030 | $15,460 |
n/a
|
| UU0282 #07 Y:2025 | 07 | 2025 | Turn off equipment when not in use | $9,350 | $3,000 |
n/a
|
| UU0282 #06 Y:2025 | 06 | 2025 | Preheat combustion air with waste heat | $3,270 | $22,800 |
n/a
|
| UU0282 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $790 | $5,550 |
n/a
|
| UU0282 #04 Y:2025 | 04 | 2025 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $7,300 | $2,900 |
n/a
|
| UU0282 #03 Y:2025 | 03 | 2025 | Change rate schedules or other changes in utility service | $12,800 | $9,600 |
n/a
|
| UU0282 #02 Y:2025 | 02 | 2025 | Purchase gas directly from a contract gas supplier | $21,900 | $12,000 |
n/a
|
| UU0282 #01 Y:2025 | 01 | 2025 | Hire energy manager | $11,100 | $4,800 |
n/a
|
| OK1142 #06 Y:2025 | 06 | 2025 | Reduce space conditioning during non-working hours | $401 | - |
n/a
|
| OK1142 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $6,818 | $1,869 |
n/a
|
| OK1142 #04 Y:2025 | 04 | 2025 | Eliminate or reduce compressed air usage | $1,322 | - |
n/a
|
| OK1142 #03 Y:2025 | 03 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,157 | $2,317 |
n/a
|
| OK1142 #02 Y:2025 | 02 | 2025 | Recover waste heat from equipment | $1,244 | $80 |
n/a
|
| OK1142 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,888 | $1,688 |
n/a
|