1,130
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0220 #06 Y:2026 | 06 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,624 | $4,000 |
n/a
|
| IP0220 #05 Y:2026 | 05 | 2026 | Recover heat from exhausted steam, hot air or hot water | $5,726 | $12,000 |
n/a
|
| IP0220 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $9,424 | $12,100 |
n/a
|
| IP0220 #03 Y:2026 | 03 | 2026 | Eliminate or reduce compressed air usage | $13,177 | $14,000 |
n/a
|
| IP0220 #02 Y:2026 | 02 | 2026 | Upgrade controls on compressors | $564 | $500 |
n/a
|
| IP0220 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $1,222 | $40 |
n/a
|
| AS0619 #07 Y:2026 | 07 | 2026 | Install spectral reflectors / delamp | $345 | $563 |
n/a
|
| AS0619 #06 Y:2026 | 06 | 2026 | Reduce space conditioning during non-working hours | $1,638 | $94 |
n/a
|
| AS0619 #05 Y:2026 | 05 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $3,570 | $4,064 |
n/a
|
| AS0619 #04 Y:2026 | 04 | 2026 | Replace existing equipment with more suitable substitutes | $10,148 | $419 |
n/a
|
| AS0619 #03 Y:2026 | 03 | 2026 | Replace fossil fuel equipment with electrical equipment | $22,021 | $900 |
n/a
|
| AS0619 #02 Y:2026 | 02 | 2026 | Use solar heat to make electricty | $63,128 | $634,056 |
n/a
|
| AS0619 #01 Y:2026 | 01 | 2026 | Replace existing equipment with more suitable substitutes | $507,698 | $1,200,000 |
n/a
|
| UW2514 #04 Y:2025 | 04 | 2025 | Use / purchase optimum sized compressor | $7,983 | $32,480 | |
| UW2514 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,640 | $7,378 | |
| UW2514 #02 Y:2025 | 02 | 2025 | Upgrade obsolete equipment | $47,564 | $93,719 | |
| UW2514 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,393 | $4,741 | |
| UU0282 #10 Y:2025 | 10 | 2025 | Utilize higher efficiency lamps and/or ballasts | $3,520 | $9,240 | |
| UU0282 #09 Y:2025 | 09 | 2025 | Air condition only space necessary | $1,130 | $2,230 | |
| UU0282 #08 Y:2025 | 08 | 2025 | Insulate bare equipment | $3,030 | $15,460 |