ITAC Assessment: AS0619
ITAC logo
ITAC Assessment: AS0619
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Castings
NAICS 331513: Steel Foundries (except Investment)
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 155
Plant Area 1,045,346
ft2
Annual Production 12,561
ton
Production Hrs. Annual 5,952
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,577,956 23,032,747
kWh
Electricity Demand $177,929 27,985
kW-mo/yr
Electricity Fees $63,189 -
Natural Gas $638,883 93,867
MMBtu
Fuel Oil #2 $55,493 1,997
MMBtu
Other Gas $158,174 1
MMBtu
Other Energy $10,588 1
MMBtu
Waste Disposal Costs
Water Usage $18,655 3,437
Tgal
Other Liquid (non-haz) $3,130 1
gal
TOTAL YEARLY COSTS $2,703,997
RECOMMENDED SAVINGS* $608,548 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $507,698 $1,200,000 $30,355
443,132
kWh
- - - $240,843 $236,500
02 2.9114: Use solar heat to make electricty $63,128 $634,056 $54,534
796,119
kWh
$8,594
-
kW-mo/yr
- - - -
03 2.1321: Replace fossil fuel equipment with electrical equipment $22,021 $900 $(-8,235.0)
(-120,223)
kWh
- $33,256
-
MMBtu
$(-3,000.0) - -
04 4.652: Replace existing equipment with more suitable substitutes $10,148 $419 - - - $10,148 - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,570 $4,064 $2,944
43,012
kWh
$626
-
kW-mo/yr
- - - -
06 2.7224: Reduce space conditioning during non-working hours $1,638 $94 $997
14,557
kWh
$641
-
kW-mo/yr
- - - -
07 2.7144: Install spectral reflectors / delamp $345 $563 $230
3,364
kWh
$50
-
kW-mo/yr
- - $65 -
TOTAL RECOMMENDED $608,548 $1,840,096 $80,825
1,179,961
kWh
$9,911
-
kW-mo/yr
$33,256
-
MMBtu
$7,148 $240,908 $236,500
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs