ITAC Assessment: AS0322
ITAC logo
ITAC Assessment: AS0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic storage containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 763,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $823,575 26,013,680
kWh
Electricity Demand $463,946 43,170
kW-mo/yr
Electricity Fees $114,834 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $194,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,576 $4,955 n/a $1,264
31,772
kWh
$1,312
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $784 $975 n/a $402
10,104
kWh
$382
-
kW-mo/yr
- -
03 2.6218: Turn off equipment when not in use $346 $1,200 n/a $148
3,722
kWh
$198
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $5,056 $3,042 n/a $3,786
571,176
kWh
$1,270
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48,861 $260 n/a $35,593
894,969
kWh
$13,268
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,742 $16,800 n/a $27,508
691,690
kWh
$9,234
-
kW-mo/yr
- -
07 3.4151: Minimize water usage $775 $60 n/a - - $775
-
Tgal
-
08 4.611: Begin a practice of predictive / preventative maintenance $77,282 $10,792 n/a - - - $77,282
09 4.454: Modify startup/shutdown times $21,858 $486 n/a - - - $21,858
TOTAL RECOMMENDED $194,280 $38,570 $68,701
2,203,433
kWh
$25,664
-
kW-mo/yr
$775
-
Tgal
$99,140
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs