Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Glass products
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 201,000
ft2
Annual Production 3,800
thousand feet
Production Hrs. Annual 6,072
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $537,346 6,404,600
kWh
Electricity Demand $145,010 20,966
kW-mo/yr
Electricity Fees $15,347 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $44,300 $54,200 $37,300
439,000
kWh
$7,000
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $31,400 $59,900 - $31,400
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,750 $1,000 $12,250
144,000
kWh
$3,500
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $5,890 $28,560 $4,440
52,210
kWh
$1,450
-
kW-mo/yr
- -
05 2.7124: Make a practice of turning off lights when not needed $4,120 - $3,470
40,800
kWh
$650
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,010 $910 $480
5,600
kWh
$60
-
kW-mo/yr
- $1,470
07 2.8123: Pay utility bills on time $1,680 - - - $1,680 -
TOTAL RECOMMENDED $105,150 $144,570 $57,940
681,610
kWh
$44,060
-
kW-mo/yr
$1,680 $1,470
TOTAL IMPLEMENTED $64,170 $55,200 $53,020
623,800
kWh
$11,150
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs