ITAC Assessment: UW2514
ITAC logo
ITAC Assessment: UW2514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Steel and aluminum castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 36,000
ft2
Annual Production 660,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,934 1,270,896
kWh
Electricity Demand $39,996 6,906
kW-mo/yr
Electricity Fees $9,659 -
Natural Gas $72,857 5,181
MMBtu
TOTAL YEARLY COSTS $228,446
RECOMMENDED SAVINGS* $66,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,393 $4,741 $1,131
13,558
kWh
$262
-
kW-mo/yr
02 2.1224: Replace boiler $55,958 $93,719 $55,958
670,956
kWh
-
03 2.7135: Install occupancy sensors $1,640 $7,378 $1,589
19,054
kWh
$51
-
kW-mo/yr
04 2.4226: Use / purchase optimum sized compressor $7,983 $32,480 $6,182
74,129
kWh
$1,801
-
kW-mo/yr
TOTAL RECOMMENDED $66,974 $138,318 $64,859
777,697
kWh
$2,114
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs