Assessment Year | 1985 |
---|---|
Principal Product | WIRE BELTS & CHAINS |
NAICS |
n/a
|
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $1 M to 5M |
# of Employees | 75 |
Plant Area |
n/a
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,841 | 718,933 |
kWh
|
$0.14 |
Natural Gas | $59,963 | 12,636 |
MMBtu
|
$4.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,956 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,049 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $474 | $219 |
$474
7,327
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $440 | $500 | - |
$440
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $811 | $200 | - |
$811
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $149 | $200 | - |
$149
-
MMBtu
|
- | |
05 | 2.3134: Shift from daytime to nighttime operation | $2,675 | - |
$7,675
-
kWh
|
- | $(-5,000.0) | |
06 | 2.3521: Reduce load on electrical conductor to reduce heating losses | $3,907 | $1,000 |
$3,907
61,254
kWh
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $532 | $500 | - |
$532
-
MMBtu
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $327 | $50 |
$327
5,275
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $174 | $100 |
$174
2,638
kWh
|
- | - | |
10 | 2.6212: Turn off equipment during breaks, reduce operating time | $467 | $100 |
$467
7,327
kWh
|
- | - | |
TOTAL RECOMMENDED | $9,956 | $2,869 |
$13,024
83,821
kWh
|
$1,932
-
MMBtu
|
$(-5,000.0) | ||
TOTAL IMPLEMENTED | $6,049 | $1,869 |
$9,117
22,567
kWh
|
$1,932
-
MMBtu
|
$(-5,000.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |