ITAC Assessment: ME0285
ITAC logo
ITAC Assessment: ME0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wooden Dowels
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area 30,000
ft2
Annual Production 2,250
units
Production Hrs. Annual 4,250
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,012 3,053,634
kWh
Fuel Oil #2 $6,764 1,431
MMBtu
Wood $3,393 4,931
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Personnel Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,698 $16,582 $5,698
54,807
kWh
- - -
02 4.221: Use only amount of packaging material necessary $3,500 - - - $3,500 -
03 2.4221: Install compressor air intakes in coolest locations $1,844 $300 $1,844
30,481
kWh
- - -
04 2.2136: Install / repair insulation on steam lines $706 $1,772 - $706
-
MMBtu
- -
05 2.2136: Install / repair insulation on steam lines $339 $600 - $339
-
MMBtu
- -
06 3.4151: Minimize water usage $160 - - - - $160
-
Tgal
TOTAL RECOMMENDED $12,247 $19,254 $7,542
85,288
kWh
$1,045
-
MMBtu
$3,500 $160
-
Tgal
TOTAL IMPLEMENTED $10,243 $18,954 $5,698
54,807
kWh
$1,045
-
MMBtu
$3,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs