Assessment Year | 2017 |
---|---|
Principal Product | Ships and Boats |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
2,778,000
ft2
|
Annual Production | 50
units
|
Production Hrs. Annual | 8,592
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $2,196,931 | 36,457,079 |
kWh
|
$0.060 | |
Electricity Demand | $284,763 | 82,083 |
kW-mo/yr
|
$3.47 | |
Electricity Fees | $369,600 | - |
|
- | |
Natural Gas | $398,021 | 92,618 |
MMBtu
|
$4.30 | |
Waste Disposal Costs | |||||
Water Usage | $691,418 | 1,480 |
Tgal
|
$467.17 | |
Water Disposal | $806,442 | 60,020 |
Tgal
|
$13.44 | |
TOTAL YEARLY COSTS | $4,747,175 | ||||
RECOMMENDED SAVINGS* | $267,981 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $230,140 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4145: Use magnetic technology to treat water | $201,762 | $50,000 | - | - | - |
$134,851
-
Tgal
|
$66,911 | |
02 | 2.4226: Use / purchase optimum sized compressor | $18,460 | $45,600 |
$18,460
315,932
kWh
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $25,653 | $51,599 | - | - |
$25,653
-
MMBtu
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $19,381 | $19,381 | - | - |
$19,381
-
MMBtu
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,725 | $250 |
$2,060
35,262
kWh
|
$665
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $267,981 | $166,830 |
$20,520
351,194
kWh
|
$665
-
kW-mo/yr
|
$45,034
-
MMBtu
|
$134,851
-
Tgal
|
$66,911 | ||
TOTAL IMPLEMENTED | $230,140 | $101,849 |
$2,060
35,262
kWh
|
$665
-
kW-mo/yr
|
$25,653
-
MMBtu
|
$134,851
-
Tgal
|
$66,911 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs