ITAC Assessment: OR0697
ITAC logo
ITAC Assessment: OR0697
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Ships and Boats
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 2,778,000
ft2
Annual Production 50
units
Production Hrs. Annual 8,592
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,196,931 36,457,079
kWh
Electricity Demand $284,763 82,083
kW-mo/yr
Electricity Fees $369,600 -
Natural Gas $398,021 92,618
MMBtu
Waste Disposal Costs
Water Usage $691,418 1,480
Tgal
Water Disposal $806,442 60,020
Tgal
TOTAL YEARLY COSTS $4,747,175
RECOMMENDED SAVINGS* $267,981 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $230,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 3.4145: Use magnetic technology to treat water $201,762 $50,000 - - - $134,851
-
Tgal
$66,911
02 2.4226: Use / purchase optimum sized compressor $18,460 $45,600 $18,460
315,932
kWh
- - - -
03 2.2511: Insulate bare equipment $25,653 $51,599 - - $25,653
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $19,381 $19,381 - - $19,381
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,725 $250 $2,060
35,262
kWh
$665
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $267,981 $166,830 $20,520
351,194
kWh
$665
-
kW-mo/yr
$45,034
-
MMBtu
$134,851
-
Tgal
$66,911
TOTAL IMPLEMENTED $230,140 $101,849 $2,060
35,262
kWh
$665
-
kW-mo/yr
$25,653
-
MMBtu
$134,851
-
Tgal
$66,911
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs