ITAC Assessment: AS0285
ITAC logo
ITAC Assessment: AS0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Foam Wood Extrusions
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 55,000
ft2
Annual Production 6,400,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,516 3,718,933
kWh
Electricity Demand $12,141 7,154
kW-mo/yr
Electricity Fees $16,785 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $229,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,166 $1,549 $866
18,171
kWh
$300
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $5,526 $7,394 $4,422
93,494
kWh
$1,104
-
kW-mo/yr
- - - -
03 3.6192: Use a less expensive method of waste removal $1,513 $960 - - - $1,513 - -
04 4.211: Consider use / purchase of bulk materials where possible $216,399 $200,000 $(-109.0)
(-2,345)
kWh
$(-1,172.0)
-
kW-mo/yr
$85,680 - $132,000 -
05 4.454: Modify startup/shutdown times $3,858 $120 - $8,346
-
kW-mo/yr
$(-4,488.0) - - -
06 4.652: Replace existing equipment with more suitable substitutes $1,339 $2,000 - - $672 - - $667
TOTAL RECOMMENDED $229,801 $212,023 $5,179
109,320
kWh
$8,578
-
kW-mo/yr
$81,864 $1,513 $132,000 $667
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs