| Assessment Year | 2026 |
|---|---|
| Principal Product | Casting |
| NAICS | 331512: Steel Investment Foundries |
| SIC | 3324: Steel Investment Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 77 |
| Plant Area |
30,000
ft2
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $162,456 | 2,306,624 |
kWh
|
$0.070 | |
| Electricity Demand | $79,774 | 6,582 |
kW-mo/yr
|
$12.12 | |
| Electricity Fees | $16,389 | - |
|
- | |
| Natural Gas | $57,615 | 7,572 |
MMBtu
|
$7.61 | |
| Waste Disposal Costs | |||||
| Water Usage | $1 | 1 |
Tgal
|
$1.00 | |
| TOTAL YEARLY COSTS | $316,235 | ||||
| RECOMMENDED SAVINGS* | $31,737 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,222 | $40 |
$1,222
17,461
kWh
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $564 | $500 |
$564
8,050
kWh
|
- | |
| 03 | 2.4239: Eliminate or reduce compressed air usage | $13,177 | $14,000 |
$7,784
111,200
kWh
|
$5,393
-
kW-mo/yr
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,424 | $12,100 |
$7,000
100,000
kWh
|
$2,424
-
kW-mo/yr
|
|
| 05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $5,726 | $12,000 |
$5,726
81,800
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,624 | $4,000 |
$1,624
23,200
kWh
|
- | |
| TOTAL RECOMMENDED | $31,737 | $42,640 |
$23,920
341,711
kWh
|
$7,817
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs