ITAC Assessment: AM0609
ITAC logo
ITAC Assessment: AM0609
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Electrical power transformers
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 201,000
ft2
Annual Production 12,500
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $739,790 8,984,495
kWh
Electricity Demand $145,644 15,712
kW-mo/yr
Electricity Fees $14,108 -
Natural Gas $428,109 80,595
MMBtu
TOTAL YEARLY COSTS $1,327,651
RECOMMENDED SAVINGS* $237,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.114: Add/modify equipment to improve drying process $98,005 $5,200 $5
(-80)
kWh
- $98,000 -
02 3.2123: Convert to high volume low pressure (hvlp) paint guns $37,900 $400 - - - $37,900
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $44,215 $2,000 $35,185
467,230
kWh
$9,030
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $24,800 $47,800 - $24,800
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,480 $23,500 $10,765
192,270
kWh
$3,715
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $8,600 - $8,600
154,000
kWh
- - -
07 2.7124: Make a practice of turning off lights when not needed $8,950 $500 $8,950
159,900
kWh
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $120 $40 $120
2,200
kWh
- - -
TOTAL RECOMMENDED $237,070 $79,440 $63,625
975,520
kWh
$37,545
-
kW-mo/yr
$98,000 $37,900
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs