Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product compressed air system components
NAICS
n/a
SIC 3596: Scales and Balances, Except Laboratory
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 195,059
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,693 5,930,832
kWh
Electricity Demand $187,684 13,427
kW-mo/yr
Electricity Fees $204 -
Natural Gas $63,630 19,692
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,280 $1,000 $1,410
77,374
kWh
$2,910
-
kW-mo/yr
- - $(-1,040.0) - -
02 2.6218: Turn off equipment when not in use $3,560 $450 $660
36,342
kWh
$2,900
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $600 - $620
34,291
kWh
$1,350
-
kW-mo/yr
- - - $(-1,370.0) -
04 3.4114: Replace city water with recycled water via cooling tower $19,000 $21,600 $(-790.0)
(-43,376)
kWh
$(-1,150.0)
-
kW-mo/yr
$9,900
-
Tgal
- - - $11,040
-
Tgal
05 3.6192: Use a less expensive method of waste removal $230 - - - - $250
-
lb
- $(-20.0) -
TOTAL RECOMMENDED $26,670 $23,050 $1,900
104,631
kWh
$6,010
-
kW-mo/yr
$9,900
-
Tgal
$250
-
lb
$(-1,040.0) $(-1,390.0) $11,040
-
Tgal
TOTAL IMPLEMENTED $4,110 $1,000 $2,030
111,665
kWh
$4,260
-
kW-mo/yr
- $250
-
lb
$(-1,040.0) $(-1,390.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs