| Assessment Year | 1999 |
|---|---|
| Principal Product | compressed air system components |
| NAICS |
n/a
|
| SIC | 3596: Scales and Balances, Except Laboratory |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
195,059
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $108,693 | 5,930,832 |
kWh
|
$0.018 |
| Electricity Demand | $187,684 | 13,427 |
kW-mo/yr
|
$13.98 |
| Electricity Fees | $204 | - |
|
- |
| Natural Gas | $63,630 | 19,692 |
MMBtu
|
$3.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,110 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,280 | $1,000 |
$1,410
77,374
kWh
|
$2,910
-
kW-mo/yr
|
- | - | $(-1,040.0) | - | - | |
| 02 | 2.6218: Turn off equipment when not in use | $3,560 | $450 |
$660
36,342
kWh
|
$2,900
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $600 | - |
$620
34,291
kWh
|
$1,350
-
kW-mo/yr
|
- | - | - | $(-1,370.0) | - | |
| 04 | 3.4114: Replace city water with recycled water via cooling tower | $19,000 | $21,600 |
$(-790.0)
(-43,376)
kWh
|
$(-1,150.0)
-
kW-mo/yr
|
$9,900
-
Tgal
|
- | - | - |
$11,040
-
Tgal
|
|
| 05 | 3.6192: Use a less expensive method of waste removal | $230 | - | - | - | - |
$250
-
lb
|
- | $(-20.0) | - | |
| TOTAL RECOMMENDED | $26,670 | $23,050 |
$1,900
104,631
kWh
|
$6,010
-
kW-mo/yr
|
$9,900
-
Tgal
|
$250
-
lb
|
$(-1,040.0) | $(-1,390.0) |
$11,040
-
Tgal
|
||
| TOTAL IMPLEMENTED | $4,110 | $1,000 |
$2,030
111,665
kWh
|
$4,260
-
kW-mo/yr
|
- |
$250
-
lb
|
$(-1,040.0) | $(-1,390.0) | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs