Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,176

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Foundries
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0220 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,624 $4,000
IP0220 #05 Y:2026 Recover heat from exhausted steam, hot air or hot water $5,726 $12,000
IP0220 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,424 $12,100
IP0220 #03 Y:2026 Eliminate or reduce compressed air usage $13,177 $14,000
IP0220 #02 Y:2026 Upgrade controls on compressors $564 $500
IP0220 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,222 $40
SJ0054 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $2,446 $13,610
SJ0054 #06 Y:2026 Insulate bare equipment $109 $183
SJ0054 #05 Y:2026 Turn off equipment during breaks, reduce operating time $1,244 -
SJ0054 #04 Y:2026 Use battery storage for demand control $8,817 -
SJ0054 #03 Y:2026 Use optimum temperature $1,605 -
SJ0054 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $3,160 -
SJ0054 #01 Y:2026 Use or replace with energy efficient substitutes $14,993 -
AS0619 #07 Y:2026 Install spectral reflectors / delamp $345 $563
AS0619 #06 Y:2026 Reduce space conditioning during non-working hours $1,638 $94
AS0619 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $3,570 $4,064
AS0619 #04 Y:2026 Replace existing equipment with more suitable substitutes $10,148 $419
AS0619 #03 Y:2026 Replace fossil fuel equipment with electrical equipment $22,021 $900
AS0619 #02 Y:2026 Use solar heat to make electricty $63,128 $634,056
AS0619 #01 Y:2026 Replace existing equipment with more suitable substitutes $507,698 $1,200,000