ITAC Assessment: UL2607
ITAC logo
ITAC Assessment: UL2607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aluminum Automotive Parts
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $100
M
to 500
M
# of Employees 390
Plant Area 313,800
ft2
Annual Production 11,195,903
lb
Production Hrs. Annual 2,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,366,548 21,442,392
kWh
Electricity Demand $6,621 46,188
kW-mo/yr
Electricity Fees $2,728 -
Natural Gas $565,751 98,789
MMBtu
Other Gas $15,215 1
MMBtu
TOTAL YEARLY COSTS $2,956,863
RECOMMENDED SAVINGS* $400,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7292: Lower ceiling to reduce conditioned space $27,920 $24,000 $27,920
252,899
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $1,596 $1,000 $1,025
9,285
kWh
- $571
-
MMBtu
03 2.2437: Recover waste heat from equipment $11,262 $25,000 - - $11,262
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,706 - $8,706
78,859
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,357 $3,420 $15,357
139,105
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $127,021 $112,125 $127,021
1,150,546
kWh
- -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $13,403 $2,331 - - $13,403
-
MMBtu
08 2.2692: Use outside cold water source as a supply of cooling water $95,772 $58,367 $95,763
867,761
kWh
$9
-
kW-mo/yr
-
09 2.9114: Use solar heat to make electricty $99,528 $621,211 $99,520
901,449
kWh
$8
-
kW-mo/yr
-
TOTAL RECOMMENDED $400,564 $847,454 $375,312
3,399,904
kWh
$17
-
kW-mo/yr
$25,236
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs