Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Printed textile products
NAICS
n/a
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 140,000
ft2
Annual Production 270,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $873,377 12,249,707
kWh
Electricity Demand $125,821 27,109
kW-mo/yr
Electricity Fees $11,632 -
Natural Gas $571,559 244,304
MMBtu
Fuel Oil #6 $244,124 69,651
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $199,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.2437: Recover waste heat from equipment $109,000 $720,000 - $109,000
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,750 $50,000 $1,970
26,964
kWh
$24,780
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,100 $24,000 $17,100
234,467
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,130 $1,000 $13,130
190,504
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $8,020 $35,000 - - $8,020
-
MMBtu
06 2.2437: Recover waste heat from equipment $6,840 $40,000 - $6,840
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,150 $5,000 $450
6,155
kWh
$5,700
-
MMBtu
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $5,760 $7,500 $5,760
83,529
kWh
- -
09 2.6218: Turn off equipment when not in use $3,790 - - - $3,790
-
MMBtu
10 2.2522: Isolate hot or cold equipment $2,280 - - - $2,280
-
MMBtu
11 2.2135: Repair and eliminate steam leaks $950 $500 - - $950
-
MMBtu
TOTAL RECOMMENDED $199,770 $883,000 $38,410
541,619
kWh
$146,320
-
MMBtu
$15,040
-
MMBtu
TOTAL IMPLEMENTED $49,160 $38,000 $36,440
514,655
kWh
$5,700
-
MMBtu
$7,020
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs