Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

220

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonferrous metal (except copper and aluminum) rolling, drawing, extruding, and alloying
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0209 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $36,956 $100
UA0209 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $17,697 $3,007
UA0209 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $5,815 $10,528
CO0725 #06 Y:2016 Utilize energy-efficient belts and other improved mechanisms $3,050 $2,950
CO0725 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,040 $13,050
CO0725 #04 Y:2016 Use filter and drying oven to reduce sludge volume $5,930 $24,000
CO0725 #03 Y:2016 Insulate bare equipment $6,010 $620
CO0725 #02 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $6,970 $1,390
CO0725 #01 Y:2016 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $8,690 $100
SF0460 #08 Y:2014 Reduce the pressure of compressed air to the minimum required $1,062 $3,703
SF0460 #07 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $3,924 $9,629
SF0460 #06 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $4,269 $9,057
SF0460 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $7,462 $9,228
SF0460 #04 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $2,945 $2,541
SF0460 #03 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $10,080 $4,429
SF0460 #02 Y:2014 Repair and eliminate steam leaks $5,167 $624
SF0460 #01 Y:2014 Reschedule plant operations or reduce load to avoid peaks $14,832 -
SU0377 #07 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,638 $5,256
SU0377 #06 Y:2014 Optimize plant power factor $5,745 $12,259
SU0377 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $1,883 $2,400