ITAC Assessment: SF0460
ITAC logo
ITAC Assessment: SF0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Special Alloys
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 25,893
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $458,549 3,567,439
kWh
Electricity Demand $217,422 10,555
kW-mo/yr
Electricity Fees $(-241,796.0) -
Natural Gas $12,003 1,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,832 - - $14,832
-
kW-mo/yr
02 2.2135: Repair and eliminate steam leaks $5,167 $624 $5,167
40,200
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,080 $4,429 $10,080
78,418
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,945 $2,541 $2,945
22,915
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,462 $9,228 $6,034
46,944
kWh
$1,428
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,269 $9,057 $4,269
33,210
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,924 $9,629 $3,924
30,528
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,062 $3,703 $867
6,889
kWh
$195
-
kW-mo/yr
TOTAL RECOMMENDED $49,741 $39,211 $33,286
259,104
kWh
$16,455
-
kW-mo/yr
TOTAL IMPLEMENTED $13,691 $13,555 $12,068
94,033
kWh
$1,623
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs