Assessment Year | 2015 |
---|---|
Principal Product | Special Alloys |
NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
SIC | 3399: Primary Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 34 |
Plant Area |
25,893
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $458,549 | 3,567,439 |
kWh
|
$0.13 |
Electricity Demand | $217,422 | 10,555 |
kW-mo/yr
|
$20.60 |
Electricity Fees | $(-241,796.0) | - |
|
- |
Natural Gas | $12,003 | 1,394 |
MMBtu
|
$8.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,741 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,691 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $14,832 | - | - |
$14,832
-
kW-mo/yr
|
|
02 | 2.2135: Repair and eliminate steam leaks | $5,167 | $624 |
$5,167
40,200
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,080 | $4,429 |
$10,080
78,418
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,945 | $2,541 |
$2,945
22,915
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,462 | $9,228 |
$6,034
46,944
kWh
|
$1,428
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,269 | $9,057 |
$4,269
33,210
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,924 | $9,629 |
$3,924
30,528
kWh
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,062 | $3,703 |
$867
6,889
kWh
|
$195
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $49,741 | $39,211 |
$33,286
259,104
kWh
|
$16,455
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $13,691 | $13,555 |
$12,068
94,033
kWh
|
$1,623
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs