Assessment Year | 2018 |
---|---|
Principal Product | Brick |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3251: Brick and Structural Clay Tile |
Sales Range | $100 M to 500M |
# of Employees | 18 |
Plant Area |
300,000
ft2
|
Annual Production | 127,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $533,627 | 9,138,967 |
kWh
|
$0.058 |
Electricity Demand | $77,633 | 26,776 |
kW-mo/yr
|
$2.90 |
Electricity Fees | $63,428 | - |
|
- |
Natural Gas | $828,137 | 241,658 |
MMBtu
|
$3.43 |
TOTAL YEARLY COSTS | $1,502,825 | |||
RECOMMENDED SAVINGS* | $294,777 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,938 | $500 |
$4,489
77,387
kWh
|
$449
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,242 | $2,000 |
$9,482
163,494
kWh
|
$760
-
kW-mo/yr
|
- | |
03 | 2.4226: Use / purchase optimum sized compressor | $2,854 | $9,000 |
$2,854
49,200
kWh
|
- | - | |
04 | 2.2441: Preheat boiler makeup water with waste process heat | $221,077 | $850,000 | - | - |
$221,077
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,358 | $92,947 |
$19,636
338,549
kWh
|
$1,722
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $34,308 | $200,000 |
$33,119
571,018
kWh
|
$1,189
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $294,777 | $1,154,447 |
$69,580
1,199,648
kWh
|
$4,120
-
kW-mo/yr
|
$221,077
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs