ITAC Assessment: LE0461
ITAC logo
ITAC Assessment: LE0461
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Brick
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $100
M
to 500
M
# of Employees 18
Plant Area 300,000
ft2
Annual Production 127,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $533,627 9,138,967
kWh
Electricity Demand $77,633 26,776
kW-mo/yr
Electricity Fees $63,428 -
Natural Gas $828,137 241,658
MMBtu
TOTAL YEARLY COSTS $1,502,825
RECOMMENDED SAVINGS* $294,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,938 $500 $4,489
77,387
kWh
$449
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,242 $2,000 $9,482
163,494
kWh
$760
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $2,854 $9,000 $2,854
49,200
kWh
- -
04 2.2441: Preheat boiler makeup water with waste process heat $221,077 $850,000 - - $221,077
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $21,358 $92,947 $19,636
338,549
kWh
$1,722
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,308 $200,000 $33,119
571,018
kWh
$1,189
-
kW-mo/yr
-
TOTAL RECOMMENDED $294,777 $1,154,447 $69,580
1,199,648
kWh
$4,120
-
kW-mo/yr
$221,077
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs