ITAC Assessment: SU0377
ITAC logo
ITAC Assessment: SU0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Super Alloy Metals
NAICS 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 130,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,209 5,604,337
kWh
Electricity Demand $80,997 23,525
kW-mo/yr
Natural Gas $49,113 6,458
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,297,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Gaseous Waste Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $854 $514 $210
4,118
kWh
$19
-
kW-mo/yr
- - $475 $150
02 3.5311: Recover and reuse waste material $1,281,641 $1,000,000 $(-134,028.0)
(-2,628,000)
kWh
$(-12,384.0)
-
kW-mo/yr
- $1,428,053
-
lb
- -
03 3.1161: Eliminate/reduce an operation $4,112 $3,576 $(-99.0)
(-1,950)
kWh
$(-124.0)
-
kW-mo/yr
- - $1,900 $2,435
04 2.4221: Install compressor air intakes in coolest locations $1,129 $998 $1,129
22,147
kWh
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,883 $2,400 $1,883
36,912
kWh
- - - - -
06 2.3212: Optimize plant power factor $5,745 $12,259 - - $5,745 - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,638 $5,256 $1,050
20,586
kWh
$194
-
kW-mo/yr
- - $114 $280
TOTAL RECOMMENDED $1,297,002 $1,025,003 $(-129,855.0)
(-2,546,187)
kWh
$(-12,295.0)
-
kW-mo/yr
$5,745 $1,428,053
-
lb
$2,489 $2,865
TOTAL IMPLEMENTED $8,487 $11,746 $3,044
59,666
kWh
$89
-
kW-mo/yr
- - $2,489 $2,865
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Gaseous Waste Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs