Assessment Year | 1985 |
---|---|
Principal Product | STEEL WIRE |
NAICS |
n/a
|
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $10 M to 50M |
# of Employees | 78 |
Plant Area |
n/a
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $251,688 | 3,036,049 |
kWh
|
$0.083 |
Natural Gas | $260,251 | 42,671 |
MMBtu
|
$6.10 |
Fuel Oil #4 | $84,149 | 14,419 |
MMBtu
|
$5.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,443 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,091 | $340 |
$1,091
13,189
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,963 | - |
$5,963
72,098
kWh
|
- | - | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $576 | $100 |
$576
7,034
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $853 | $200 |
$853
10,258
kWh
|
- | - | |
05 | 2.3191: Use demand controller or load shedder | $6,080 | $1,900 |
$6,080
-
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $1,488 | - | - |
$1,488
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $1,100 | $3,100 | - |
$1,100
-
MMBtu
|
- | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,936 | $537 | - | - |
$1,936
-
MMBtu
|
|
09 | 3.4154: Eliminate leaks in water lines and valves | $504 | $40 | - | - |
$504
-
MMBtu
|
|
10 | 2.2444: Use hot process fluids to preheat incoming process fluids | $4,126 | $1,770 | - | - |
$4,126
-
MMBtu
|
|
11 | 2.7441: Replace broken windows and/or window sash | $4,383 | $87 | - | - |
$4,383
-
MMBtu
|
|
12 | 2.7224: Reduce space conditioning during non-working hours | $384 | - | - |
$384
-
MMBtu
|
- | |
13 | 2.7492: Use proper thickness of insulation on building envelope | $39,416 | $45,000 | - | - |
$39,416
-
MMBtu
|
|
TOTAL RECOMMENDED | $67,900 | $53,074 |
$14,563
102,579
kWh
|
$2,972
-
MMBtu
|
$50,365
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,443 | $2,577 |
$12,619
79,132
kWh
|
$384
-
MMBtu
|
$2,440
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs