199
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Secondary smelting and alloying of aluminum | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0189 #03 Y:2022 | 03 | 2022 | Improve combustion control capability | $4,948 | $15,600 | |
| WM0189 #02 Y:2022 | 02 | 2022 | Utilize higher efficiency lamps and/or ballasts | $31,780 | $20,906 | |
| WM0189 #01 Y:2022 | 01 | 2022 | Use waste heat from hot flue gases to preheat | $38,963 | $75,000 | |
| TT0242 #06 Y:2020 | 06 | 2020 | Install timers and/or thermostats | $1,854 | $1,700 | |
| TT0242 #05 Y:2020 | 05 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,251 | $263 | |
| TT0242 #04 Y:2020 | 04 | 2020 | Meter recycled water (to reduce sewer charges) | $13,945 | $1,900 | |
| TT0242 #03 Y:2020 | 03 | 2020 | Utilize higher efficiency lamps and/or ballasts | $24,394 | $110,050 | |
| TT0242 #02 Y:2020 | 02 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $31,412 | $62,026 | |
| TT0242 #01 Y:2020 | 01 | 2020 | Change procedures / equipment / operating conditions | $1,906,442 | $4,500,000 | |
| WV0506 #10 Y:2015 | 10 | 2015 | Develop a repair/replace policy | $790 | $1,205 | |
| WV0506 #09 Y:2015 | 09 | 2015 | Establish a predictive maintenance program | $1,221 | $1,000 | |
| WV0506 #08 Y:2015 | 08 | 2015 | Install vinyl strip / high speed / air curtain doors | $1,372 | $351 | |
| WV0506 #07 Y:2015 | 07 | 2015 | Reduce the pressure of compressed air to the minimum required | $1,579 | $270 | |
| WV0506 #06 Y:2015 | 06 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $1,757 | $5,570 | |
| WV0506 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $2,457 | $7,450 | |
| WV0506 #04 Y:2015 | 04 | 2015 | Recover waste heat from equipment | $3,073 | $3,560 | |
| WV0506 #03 Y:2015 | 03 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $3,907 | - | |
| WV0506 #02 Y:2015 | 02 | 2015 | Utilize higher efficiency lamps and/or ballasts | $8,853 | $7,076 | |
| WV0506 #01 Y:2015 | 01 | 2015 | Utilize higher efficiency lamps and/or ballasts | $10,708 | $22,650 | |
| UA0115 #07 Y:2013 | 07 | 2013 | Reduce excessive boiler blowdown | $5,071 | $6,000 |