Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

199

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Secondary smelting and alloying of aluminum
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0189 #03 Y:2022 Improve combustion control capability $4,948 $15,600
WM0189 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $31,780 $20,906
WM0189 #01 Y:2022 Use waste heat from hot flue gases to preheat $38,963 $75,000
TT0242 #06 Y:2020 Install timers and/or thermostats $1,854 $1,700
TT0242 #05 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $4,251 $263
TT0242 #04 Y:2020 Meter recycled water (to reduce sewer charges) $13,945 $1,900
TT0242 #03 Y:2020 Utilize higher efficiency lamps and/or ballasts $24,394 $110,050
TT0242 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $31,412 $62,026
TT0242 #01 Y:2020 Change procedures / equipment / operating conditions $1,906,442 $4,500,000
WV0506 #10 Y:2015 Develop a repair/replace policy $790 $1,205
WV0506 #09 Y:2015 Establish a predictive maintenance program $1,221 $1,000
WV0506 #08 Y:2015 Install vinyl strip / high speed / air curtain doors $1,372 $351
WV0506 #07 Y:2015 Reduce the pressure of compressed air to the minimum required $1,579 $270
WV0506 #06 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $1,757 $5,570
WV0506 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,457 $7,450
WV0506 #04 Y:2015 Recover waste heat from equipment $3,073 $3,560
WV0506 #03 Y:2015 Reschedule plant operations or reduce load to avoid peaks $3,907 -
WV0506 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $8,853 $7,076
WV0506 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $10,708 $22,650
UA0115 #07 Y:2013 Reduce excessive boiler blowdown $5,071 $6,000