ITAC Assessment: WV0506
ITAC logo
ITAC Assessment: WV0506
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Aluminum Finishing
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 62,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,266 1,905,825
kWh
Electricity Demand $68,241 11,312
kW-mo/yr
Natural Gas $47,837 7,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,708 $22,650 $8,784
110,627
kWh
$1,924
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,853 $7,076 $7,255
91,946
kWh
$1,598
-
kW-mo/yr
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,907 - - $3,907
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $3,073 $3,560 - - $3,073
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,457 $7,450 $2,017
25,404
kWh
$440
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,757 $5,570 $1,443
18,174
kWh
$314
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,579 $270 $1,296
16,328
kWh
$283
-
kW-mo/yr
- -
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,372 $351 - - $1,372
-
MMBtu
-
09 2.4157: Establish a predictive maintenance program $1,221 $1,000 $5,939
74,799
kWh
$1,302
-
kW-mo/yr
- $(-6,020.0)
10 2.4151: Develop a repair/replace policy $790 $1,205 $1,089
13,715
kWh
$241
-
kW-mo/yr
- $(-540.0)
TOTAL RECOMMENDED $35,717 $49,132 $27,823
350,993
kWh
$10,009
-
kW-mo/yr
$4,445
-
MMBtu
$(-6,560.0)
TOTAL IMPLEMENTED $14,900 $17,001 $17,596
222,192
kWh
$3,864
-
kW-mo/yr
- $(-6,560.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings