ITAC Assessment: WM0189
ITAC logo
ITAC Assessment: WM0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product HPDC Automotive Parts
NAICS 331314: Secondary Smelting and Alloying of Aluminum
SIC 3363: Aluminum Die-Castings
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 220,000
ft2
Annual Production 24,724
ton
Production Hrs. Annual 8,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,298,286 25,037,769
kWh
Electricity Demand $579,264 50,511
kW-mo/yr
Electricity Fees $119,777 -
Natural Gas $1,484,669 225,062
MMBtu
Waste Disposal Costs
Water Usage $450,854 259,166
Tgal
TOTAL YEARLY COSTS $3,932,850
RECOMMENDED SAVINGS* $81,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,779

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $38,963 $75,000 - - $38,963
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $31,780 $20,906 $25,522
490,798
kWh
$6,258
-
kW-mo/yr
- -
03 2.1116: Improve combustion control capability $4,948 $15,600 - - $4,948
-
MMBtu
-
04 2.8112: Combine utility meters $2,274 - - - - $2,274
05 2.4322: Use or replace with energy efficient substitutes $1,529 $2,900 $1,529
29,400
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $873 $5,496 $703
13,512
kWh
$171
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $683 $2,500 $550
10,583
kWh
$133
-
kW-mo/yr
- -
08 2.7444: Close holes and openings in building such as broken windows $614 $880 - - $614
-
MMBtu
-
TOTAL RECOMMENDED $81,663 $123,282 $28,303
544,293
kWh
$6,562
-
kW-mo/yr
$44,524
-
MMBtu
$2,274
TOTAL IMPLEMENTED $8,779 $23,596 $1,253
24,095
kWh
$304
-
kW-mo/yr
$4,948
-
MMBtu
$2,274
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs