Assessment Year | 2014 |
---|---|
Principal Product | Recycle metal from used and obsolete oil filled electrical equipment |
NAICS | 331314: Secondary Smelting and Alloying of Aluminum |
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
67,450
ft2
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $247,274 | 2,556,480 |
kWh
|
$0.097 |
Electricity Demand | $35,849 | 7,563 |
kW-mo/yr
|
$4.74 |
Electricity Fees | $17,647 | - |
|
- |
Natural Gas | $110,459 | 14,938 |
MMBtu
|
$7.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,447 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,157 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,982 | $22,285 |
$14,828
153,343
kWh
|
$1,218
-
kW-mo/yr
|
$936 | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,820 | $800 |
$8,374
86,601
kWh
|
$905
-
kW-mo/yr
|
$541 | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,145 | $2,595 |
$7,201
74,469
kWh
|
$495
-
kW-mo/yr
|
$449 | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $7,420 | $10,540 |
$7,011
72,503
kWh
|
- | $409 | - | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $4,817 | $23,475 |
$3,062
31,661
kWh
|
$1,490
-
kW-mo/yr
|
$265 | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $3,192 | $1,920 | - | - | - |
$3,192
-
MMBtu
|
- | |
07 | 2.1241: Reduce excessive boiler blowdown | $5,071 | $6,000 | - | - | - |
$4,416
-
MMBtu
|
$655
-
Tgal
|
|
TOTAL RECOMMENDED | $55,447 | $67,615 |
$40,476
418,577
kWh
|
$4,108
-
kW-mo/yr
|
$2,600 |
$7,608
-
MMBtu
|
$655
-
Tgal
|
||
TOTAL IMPLEMENTED | $21,157 | $5,315 |
$15,575
161,070
kWh
|
$1,400
-
kW-mo/yr
|
$990 |
$3,192
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs