ITAC Assessment: OK0172
ITAC logo
ITAC Assessment: OK0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PORTA-DRILLING EQUIPMENT
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,549 3,834,994
kWh
Natural Gas $99,208 26,904
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,908

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $14,817 - $2,295
60,961
kWh
$12,522
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $575 $864 $575
9,672
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $485 $154 $485
5,862
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,663 $2,050 $4,663
78,253
kWh
-
05 2.7261: Install timers and/or thermostats $49,981 $1,200 - $49,981
-
MMBtu
06 2.7261: Install timers and/or thermostats $476 $100 - $476
-
MMBtu
07 2.7261: Install timers and/or thermostats $2,911 $600 - $2,911
-
MMBtu
08 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $5,133 $2,148 - $5,133
-
MMBtu
09 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,052 $1,893 - $2,052
-
MMBtu
TOTAL RECOMMENDED $81,093 $9,009 $8,018
154,748
kWh
$73,075
-
MMBtu
TOTAL IMPLEMENTED $73,908 $4,968 $8,018
154,748
kWh
$65,890
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs