ITAC Assessment: MZ0094
ITAC logo
ITAC Assessment: MZ0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Electrical Insulators
NAICS 335311: Power, Distribution, and Specialty Transformer Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 125,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 8,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,892 2,445,223
kWh
Electricity Demand $54,023 4,815
kW-mo/yr
Natural Gas $50,256 6,518
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,009

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $3,057 $1,160 $2,079
59,236
kWh
$977
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $7,672 $3,000 $6,673
190,125
kWh
$998
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,711 $27,900 $10,687
304,482
kWh
$5,024
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $621 - $422
12,024
kWh
$198
-
kW-mo/yr
-
05 2.2622: Replace existing chiller with high efficiency model $6,785 $30,700 $2,396
68,460
kWh
$4,389
-
kW-mo/yr
-
06 2.7231: Use radiant heater for spot heating $12,505 $14,400 $129
3,722
kWh
$722
-
kW-mo/yr
$11,654
07 2.6127: Maintain air filters by cleaning or replacement $1,836 $900 $1,249
35,575
kWh
$587
-
kW-mo/yr
-
TOTAL RECOMMENDED $48,186 $78,060 $23,636
673,625
kWh
$12,896
-
kW-mo/yr
$11,654
TOTAL IMPLEMENTED $28,009 $60,660 $16,833
479,777
kWh
$11,176
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs