Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,057

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Steel product manufacturing from purchased steel
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0207 #01 Y:2004 Replace boiler $109,438 $9,760
IC0094 #08 Y:2004 Use most efficient type of electric motors $2,394 $5,123
IC0094 #07 Y:2004 Eliminate or reduce compressed air usage $2,655 $2,640
IC0094 #06 Y:2004 Reduce the pressure of compressed air to the minimum required $1,200 -
IC0094 #05 Y:2004 Eliminate or reduce compressed air usage $992 $890
IC0094 #04 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $9,623 $3,900
IC0094 #03 Y:2004 Replace city water with recycled water via cooling tower $24,437 $32,056
IC0094 #02 Y:2004 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $1,962 $6,778
IC0094 #01 Y:2004 Recycle air for heating, ventilation and air conditioning $28,301 $54,519
UD0711 #08 Y:2004 Insulate bare equipment $1,305 $3,530
UD0711 #07 Y:2004 Upgrade controls on compressors $4,427 $600
UD0711 #06 Y:2004 Reduce the pressure of compressed air to the minimum required $4,651 $1,240
UD0711 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $13,813 $2,025
UD0711 #04 Y:2004 Utilize higher efficiency lamps and/or ballasts $23,341 $80,215
UD0711 #03 Y:2004 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $113,328 $400,000
UD0711 #02 Y:2004 Use heat in flue gases to preheat products or materials $143,601 $246,784
UD0711 #01 Y:2004 Use counter current rinsing to reduce waste water $343,339 $10,000
WI0476 #08 Y:2004 Utilize energy-efficient belts and other improved mechanisms $308 $776
WI0476 #07 Y:2004 Install compressor air intakes in coolest locations $1,141 $640
WI0476 #06 Y:2004 Eliminate or reduce compressed air usage $1,148 -