ITAC Assessment: UD0711
ITAC logo
ITAC Assessment: UD0711
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Electroplated and coated steel
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 350,000
ft2
Annual Production 170,000
ton
Production Hrs. Annual 4,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $699,719 13,531,789
kWh
Natural Gas $524,089 122,265
MMBtu
Other Gas $469,607 116,767
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $647,805 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,769

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.4153: Use counter current rinsing to reduce waste water $343,339 $10,000 - - $7,831
-
Tgal
$335,508 -
02 2.2424: Use heat in flue gases to preheat products or materials $143,601 $246,784 $(-343.0)
(-6,726)
kWh
$141,843
-
MMBtu
- - $2,101
-
Tgal
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $113,328 $400,000 $70,992
1,392,000
kWh
$42,336
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,341 $80,215 $20,655
405,000
kWh
- - $2,686 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,813 $2,025 $13,813
270,840
kWh
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,651 $1,240 $4,651
91,200
kWh
- - - -
07 2.4224: Upgrade controls on compressors $4,427 $600 $4,427
86,800
kWh
- - - -
08 2.2511: Insulate bare equipment $1,305 $3,530 - $1,305
-
MMBtu
- - -
TOTAL RECOMMENDED $647,805 $744,394 $114,195
2,239,114
kWh
$185,484
-
MMBtu
$7,831
-
Tgal
$338,194 $2,101
-
Tgal
TOTAL IMPLEMENTED $19,769 $6,795 $18,464
362,040
kWh
$1,305
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs