204
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0263 #10 Y:2007 | 10 | 2007 | Recover waste heat from equipment | $4,781 | $6,000 | |
| LE0263 #09 Y:2007 | 09 | 2007 | Use / purchase optimum sized compressor | $6,837 | $6,837 | |
| LE0263 #08 Y:2007 | 08 | 2007 | Install / repair insulation on steam lines | $9,899 | $22,894 | |
| LE0263 #07 Y:2007 | 07 | 2007 | Use / purchase optimum sized compressor | $11,256 | $50,000 | |
| LE0263 #06 Y:2007 | 06 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,639 | $1,000 | |
| LE0263 #05 Y:2007 | 05 | 2007 | Analyze flue gas for proper air/fuel ratio | $25,485 | $20,000 | |
| LE0263 #04 Y:2007 | 04 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $43,993 | $70,000 | |
| LE0263 #03 Y:2007 | 03 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $103,515 | $150,000 | |
| LE0263 #02 Y:2007 | 02 | 2007 | Install partitions to reduce size of conditioned space | $59,097 | $300 | |
| LE0263 #01 Y:2007 | 01 | 2007 | Use solar heat to make electricty | $88,058 | $368,500 | |
| UU0113 #04 Y:2006 | 04 | 2006 | Use waste heat to produce steam to drive a steam turbine-generator | $87,860 | $500,000 | |
| UU0113 #03 Y:2006 | 03 | 2006 | Use adjustable frequency drive or multiple speed motors on existing system | $45,530 | $20,000 | |
| UU0113 #02 Y:2006 | 02 | 2006 | Reduce the pressure of compressed air to the minimum required | $173,190 | $46,250 | |
| UU0113 #01 Y:2006 | 01 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,620 | $180 | |
| IC0123 #05 Y:2006 | 05 | 2006 | Treat and reuse rinse waters | $92,357 | $31,583 | |
| IC0123 #04 Y:2006 | 04 | 2006 | Use waste heat from hot flue gases to preheat | $861,835 | $1,928,400 | |
| IC0123 #03 Y:2006 | 03 | 2006 | Use or replace with energy efficient substitutes | $1,509,727 | $6,804,600 | |
| IC0123 #02 Y:2006 | 02 | 2006 | Adjust burners for efficient operation | $76,409 | $252,000 | |
| IC0123 #01 Y:2006 | 01 | 2006 | Recover waste heat from equipment | $2,641,138 | $12,550,416 | |
| WV0347 #11 Y:2006 | 11 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $457 | $158 |