Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

204

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Iron and steel mills and ferroalloy manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0263 #10 Y:2007 Recover waste heat from equipment $4,781 $6,000
LE0263 #09 Y:2007 Use / purchase optimum sized compressor $6,837 $6,837
LE0263 #08 Y:2007 Install / repair insulation on steam lines $9,899 $22,894
LE0263 #07 Y:2007 Use / purchase optimum sized compressor $11,256 $50,000
LE0263 #06 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $15,639 $1,000
LE0263 #05 Y:2007 Analyze flue gas for proper air/fuel ratio $25,485 $20,000
LE0263 #04 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $43,993 $70,000
LE0263 #03 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $103,515 $150,000
LE0263 #02 Y:2007 Install partitions to reduce size of conditioned space $59,097 $300
LE0263 #01 Y:2007 Use solar heat to make electricty $88,058 $368,500
UU0113 #04 Y:2006 Use waste heat to produce steam to drive a steam turbine-generator $87,860 $500,000
UU0113 #03 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $45,530 $20,000
UU0113 #02 Y:2006 Reduce the pressure of compressed air to the minimum required $173,190 $46,250
UU0113 #01 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $3,620 $180
IC0123 #05 Y:2006 Treat and reuse rinse waters $92,357 $31,583
IC0123 #04 Y:2006 Use waste heat from hot flue gases to preheat $861,835 $1,928,400
IC0123 #03 Y:2006 Use or replace with energy efficient substitutes $1,509,727 $6,804,600
IC0123 #02 Y:2006 Adjust burners for efficient operation $76,409 $252,000
IC0123 #01 Y:2006 Recover waste heat from equipment $2,641,138 $12,550,416
WV0347 #11 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $457 $158