Assessment Year | 2006 |
---|---|
Principal Product | Steel Rebar |
NAICS | 331110: Iron and Steel Mills and Ferroalloy Manufacturing |
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | greater than $500 M |
# of Employees | 380 |
Plant Area |
750,000
ft2
|
Annual Production | 1,000,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $10,177,664 | 603,120,000 |
kWh
|
$0.017 |
Electricity Demand | $9,418,651 | 1,093,920 |
kW-mo/yr
|
$8.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $310,200 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,620 | $180 |
$3,360
83,890
kWh
|
$1,460
-
kW-mo/yr
|
$(-1,200.0) | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $173,190 | $46,250 |
$133,750
3,343,840
kWh
|
$39,440
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $45,530 | $20,000 |
$35,160
879,080
kWh
|
$10,370
-
kW-mo/yr
|
- | |
04 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $87,860 | $500,000 |
$67,200
1,680,000
kWh
|
$20,660
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $310,200 | $566,430 |
$239,470
5,986,810
kWh
|
$71,930
-
kW-mo/yr
|
$(-1,200.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs