ITAC Assessment: WV0347
ITAC logo
ITAC Assessment: WV0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Forged Hard Steel Rolls
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 152,000
ft2
Annual Production 43,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $852,166 10,976,400
kWh
Electricity Demand $2,485 17,604
kW-mo/yr
Electricity Fees $2,899 -
Natural Gas $1,754,369 120,933
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $340,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $284,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $255,013 $57,159 - - $255,013
-
MMBtu
-
02 2.2426: Use waste heat from flue gases to heat space conditioning air $32,512 $24,300 $(-913.0)
(-11,720)
kWh
$(-6.0)
-
kW-mo/yr
$33,431
-
MMBtu
-
03 2.4157: Establish a predictive maintenance program $11,796 $1,000 $12,437
159,685
kWh
$31
-
kW-mo/yr
- $(-672.0)
04 2.4151: Develop a repair/replace policy $10,908 $504 $12,437
159,685
kWh
$31
-
kW-mo/yr
- $(-1,560.0)
05 2.2628: Utilize a less expensive cooling method $10,012 $13,815 $9,995
128,334
kWh
$17
-
kW-mo/yr
- -
06 2.4239: Eliminate or reduce compressed air usage $6,834 $250 $6,823
87,463
kWh
$11
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $5,696 $10,600 $(-958.0)
(-12,306)
kWh
$(-6.0)
-
kW-mo/yr
$6,660
-
MMBtu
-
08 2.7231: Use radiant heater for spot heating $5,557 $2,790 - - $5,557
-
MMBtu
-
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,051 $65 $1,048
13,456
kWh
$3
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $915 $245 $913
11,825
kWh
$2
-
kW-mo/yr
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $457 $158 $456
5,860
kWh
$1
-
kW-mo/yr
- -
TOTAL RECOMMENDED $340,751 $110,886 $42,238
542,282
kWh
$84
-
kW-mo/yr
$300,661
-
MMBtu
$(-2,232.0)
TOTAL IMPLEMENTED $284,325 $61,518 $25,922
332,826
kWh
$65
-
kW-mo/yr
$260,570
-
MMBtu
$(-2,232.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs