ITAC Assessment: HO0051
ITAC logo
ITAC Assessment: HO0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Chocolate Candy
NAICS
n/a
SIC 2066: Chocolate and Cocoa Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 140,000
ft2
Annual Production 14,500,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $707,277 6,844,959
kWh
Natural Gas $28,184 3,495
MMBtu
Fuel Oil #4 $67,594 18,231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,441 $7,564 $11,441
111,079
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,141 $7,715 $4,141
40,152
kWh
03 2.4133: Use most efficient type of electric motors $1,993 $3,250 $1,993
19,343
kWh
04 2.4221: Install compressor air intakes in coolest locations $240 $300 $240
2,345
kWh
TOTAL RECOMMENDED $17,815 $18,829 $17,815
172,919
kWh
TOTAL IMPLEMENTED $17,575 $18,529 $17,575
170,574
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs