ITAC Assessment: MI0252
ITAC logo
ITAC Assessment: MI0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pharmacuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 100,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,947 7,058,100
kWh
Electricity Demand $164,598 11,379
kW-mo/yr
Electricity Fees $100,796 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,914 $44,016 $37,833
879,826
kWh
$4,081
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $9,567 $80 $4,603
107,040
kWh
$4,964
-
kW-mo/yr
03 2.7447: Install vinyl strip / high speed / air curtain doors $6,770 $5,739 $3,254
75,657
kWh
$3,516
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,776 $7,350 $2,998
69,713
kWh
$2,778
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,603 $4,840 $2,215
51,516
kWh
$2,388
-
kW-mo/yr
06 2.7135: Install occupancy sensors $2,506 $2,600 $1,204
27,999
kWh
$1,302
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,008 $13,170 $966
22,464
kWh
$1,042
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,796 $80 $754
17,542
kWh
$1,042
-
kW-mo/yr
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,764 $1,660 $736
17,120
kWh
$1,028
-
kW-mo/yr
TOTAL RECOMMENDED $76,704 $79,535 $54,563
1,268,877
kWh
$22,141
-
kW-mo/yr
TOTAL IMPLEMENTED $21,409 $11,770 $10,295
239,414
kWh
$11,114
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs