ITAC Assessment: AR0187
ITAC logo
ITAC Assessment: AR0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Injection Molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 28,500
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,670 893,025
kWh
Electricity Demand $29,896 2,901
kW-mo/yr
Natural Gas $1,611 213
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $479,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $558

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings
01 2.7111: Reduce illumination to minimum necessary levels $608 $720 $358
9,672
kWh
$250
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $310 $130 $150
4,103
kWh
$160
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,257 $2,916 $728
19,637
kWh
$529
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $526 $783 $350
9,379
kWh
$176
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $32 - $21
586
kWh
$11
-
kW-mo/yr
- - -
06 2.2511: Insulate bare equipment $1,789 $3,600 $1,789
48,359
kWh
- - - -
07 3.6192: Use a less expensive method of waste removal $1,157 $5,000 - - $1,157
-
lb
- -
08 4.446: Automate finishing process $76,150 $6,000 - - - $76,150 -
09 4.441: Install automatic packing equipment $397,208 $44,000 - - - - $397,208
TOTAL RECOMMENDED $479,037 $63,149 $3,396
91,736
kWh
$1,126
-
kW-mo/yr
$1,157
-
lb
$76,150 $397,208
TOTAL IMPLEMENTED $558 $783 $371
9,965
kWh
$187
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs